AG Barr

Supply Chain Optimisation for Soft Drinks manufacturer

 

AG-Barr-original-locations

Objective: Transform the Cumbernauld location to new design incorporating high racked automatic storage and retrieval warehouse. Specification to include automatic storage of 10,000 pallets which can be put away and retrieved at 100 per hour. Provided under separate MF1 contract of supply. 

AG-Barr-Cumbernauld-original
AG Barr Cumbernauld site – original

 

AG Barr Cumbernauld site - new design
AG Barr Cumbernauld site – new design

 

New high rack warehouse under construction
New high rack warehouse under construction

 

high-rack-warehouse
high rack warehouse

 

pallet-conveyer
pallet conveyer

 

Inside low bay order picking and assembly warehouse
Inside low bay order picking and assembly warehouse
 

IT Systems were key to success!

  • Integration with existing business systems.
  • Functionality of new systems.
  • Effective and reliable interfaces.
  • Resilience, backup, networks.
  • People:- training and use of new systems.
 
AGBarr plan v actual
AGBarr plan v actual

Outcome of Distribution Plant

Time
Finished on time despite main contractor going into receivership.
Costs
Capital budget £14.3M Actual spend £14.2M
Released £6m from other properties.
Benefits
Savings budget £2.5M/a actual £2.5M/a
Capacity
Stored 12,750 pallets as planned
Loaded & unloaded up to 80 wagons per day as planned
No reportable accidents or other unplanned events.

New Can line 1400 cans per minute

Supervised and coached the Project Manger for a £6M can line, 84,000 cans per hour benefits of £2m/pa
Supervised and coached the Project Manger for a £6M can line, 84,000 cans per hour benefits of £2m/pa

 

Robotic palletiser on the can line
Robotic palletiser on the can line

Existing factory office upgraded to head office

Factory buildings upgraded to head office
Factory buildings upgraded to head office